[{"data":1,"prerenderedAt":62},["ShallowReactive",2],{"case-precision-manufacturing-asset":3},{"slug":4,"client":5,"industry":8,"industryKey":11,"scale":12,"services":15,"summary":18,"background":21,"solution":24,"metrics":27,"testimonial":43,"duration":51,"phases":54,"featured":60,"published":60,"date":61},"precision-manufacturing-asset",{"zh":6,"en":7},"某精密零部件制造企业","A Precision Components Manufacturer",{"zh":9,"en":10},"制造业","Manufacturing","manufacturing",{"zh":13,"en":14},"200–500 人","200–500 employees",[16,17],"asset","managed",{"zh":19,"en":20},"通过一机一码 SN 池重建资产台账，配合数字化管家持续运维，资产盘点周期由 15 天缩短至 3 天。","Rebuilt the asset ledger with per-unit SN tracking and added continuous stewardship, cutting inventory cycle from 15 days to 3.",{"zh":22,"en":23},"该企业为精密零部件制造企业，员工约 300 人，此前 IT 资产由行政兼管，台账记录停留在型号级别。随着设备批次增多，账实长期不符，每���盘点需全员停工一天，仍难以核对清楚。设备频繁调拨与维修换件进一步导致编号混乱，资产流失与重复采购难以发现。","A precision components manufacturer with around 300 employees previously had IT assets co-managed by administration, with records kept only at the model level. As device batches grew, ledgers and reality diverged; each stocktake required a full day of production stoppage and still could not be reconciled. Frequent transfers and part replacements further confused identifiers, making asset loss and duplicate purchasing hard to detect.",{"zh":25,"en":26},"企数管家以「IT 资产·运维管理」切入，为全部存量设备建立 SN 池并逐台登记，绑定型号、批次、到货日期与责任人；领用、调拨、维修换件、报废全流程在 SN 维度留痕，维修换件挂在同一 SN 下不新建条目。同时由 TAM 技术经理管家接管日常运维，建立定期巡检与工单响应机制。资产台账与运维体系同步建立后，设备流转与维护历史全程可追溯。","Enterprise Digital Steward started with IT Asset & Operations Management: an SN pool was created and every existing device registered individually, binding model, batch, arrival date and owner. Assignment, transfer, part replacement and retirement were all recorded at SN level, with part replacements attaching to the same SN rather than creating new entries. A TAM Technical Manager Steward then took over day-to-day operations with regular inspection and work-order response. With the ledger and operations system in place, device movement and maintenance history became fully traceable.",[28,33,38],{"value":29,"label":30},"15天 → 3天",{"zh":31,"en":32},"资产盘点周期","Asset stocktake cycle",{"value":34,"label":35},"降低 40%",{"zh":36,"en":37},"台账维护人力投入","Ledger admin effort",{"value":39,"label":40},"100%",{"zh":41,"en":42},"设备 SN 登记覆盖率","Device SN coverage",{"quote":44,"author":47,"role":48},{"zh":45,"en":46},"以前盘点要停工一天，还总是对不上。现在扫码核对就行，账实终于清楚了。","Stocktake used to cost us a full production day and still never matched. Now we just scan and reconcile — the numbers finally match reality.","客户 IT 负责人",{"zh":49,"en":50},"IT 负责人","IT Lead",{"zh":52,"en":53},"3 个月（建账 + 运维接管）","3 months (ledger build + operations takeover)",[55,56,57,58,59],"p","r","d","i","o",true,"2026-09-20",1791962663408]